Cyber security for government suppliers, with proof you can show.

Cyber security for Melbourne organisations that supply or answer to government, set up so an assessment gets a documented answer instead of an assurance.

What a government supplier answers for

  • Essential Eight Often the baseline a contract schedule measures you against.
  • Privacy Act The information you hold for an agency, and showing how it is protected.
  • Records management obligations What has to be kept, for how long, and proof it was not altered or destroyed early.

Two of our team hold the CISSP, Certified Information Systems Security Professional. We do not advise on the law itself.

The difference between a claim and evidence.

A tender schedule asks what you can produce. The answer has to be a document you can hand over.

  1. Multi-factor authentication

    The claim: MFA is enabled

    What counts as evidence: A report showing which accounts are covered, which are exempt and why, dated.

  2. Patching

    The claim: We patch regularly

    What counts as evidence: Compliance figures against a stated timeframe, over months, including what failed.

  3. Backups

    The claim: Backups run nightly

    What counts as evidence: A restoration test with a date, a result and who performed it.

  4. Access control

    The claim: Access is restricted

    What counts as evidence: A review record showing who was removed and when, as well as who has access now.

  5. Application control

    The claim: We control what runs

    What counts as evidence: The policy, plus what happened when somebody tried to run something else.

Four things that catch government-connected organisations.

A schedule asked what maturity level we operate at

The question arrives inside a tender, with a deadline attached and no time to prepare.

What we do: find your actual position first, so the answer is a document you can stand behind.

Their obligations became ours

Security conditions in the head contract pass down to suppliers, and nobody read that schedule closely at signing.

What we do: read it with you and separate what applies from what was copied in.

We cannot show what happened to a record

Retention and disposal obligations need evidence, and most systems are configured for convenience.

What we do: configure for evidence, and write down how it works.

Our assessment was done by the people who did the work

It is a fair answer until somebody asks who assessed it.

What we do: tell you when independence is what the situation requires, even when that means it is not us.

What good looks like

Good looks like logging switched on before it was needed, access reviews with dates on them, and a restore that somebody performed.

From wherever you are to something you can hand over.

Paced to survive a procurement timeline, and scoped to the schedule in front of you.

Illustration: two people laying labelled tender documents out in order on a long table
  1. Establish the real position

    An Essential Eight assessment, plus whatever the contract schedule requires, which is often narrower than it first looks.

    You holdYour actual position, as a document you can stand behind
  2. Separate what applies from what was copied in

    Contract schedules are often generic. Knowing which clauses apply to your organisation is usually the largest saving available.

    You holdThe clauses that apply to you, read with you
  3. Close the gaps that matter to the obligation

    Ordered by what the assessment or the contract will ask about, ahead of severity scores.

    You holdSystems configured for evidence, and how they work written down
  4. Leave you holding the evidence

    Dated, in a form somebody else can read.

    You holdA folder the next tender or review is answered from

Questions government suppliers ask us

We supply an agency rather than being one. Does any of this apply to us?

Usually yes, and it surprises people. Security conditions in a government contract flow down to suppliers, and organisations often discover this mid-tender, when a schedule asks what maturity level they operate at. Being asked is not the problem; being asked with no answer prepared is.

Can you get us to Essential Eight Maturity Level 2?

An Essential Eight assessment tells you where you are and what it costs to move, and we can do the work. What nobody can do is award you a level: maturity is a description of your controls, assessed against ASD's maturity model, and an assessment carried out by the people who did the work is worth less than an independent one. We will say when independence is what you need. Our guide to the Essential Eight explains what each level is built to stop.

Is the Essential Eight enough on its own?

No,

and it does not claim to be. It is a baseline aimed at the most common attacks. For a larger or more regulated organisation, enterprise cyber consulting covers the governance and standards work beyond it. If a supplier tells you the Essential Eight covers your whole obligation, ask them what it says about your records obligations or your own suppliers.

How do records obligations affect the technology?

Mostly in retention and disposal: what has to be kept, for how long, and being able to show it was not altered or destroyed early. It shapes how systems are configured and it is a common gap, because most technology defaults are built for convenience.

We are a small not for profit with one government contract. Is this proportionate?

Often it is not, and we will say so. A small organisation with one contract usually needs a defensible answer to a specific schedule, not a whole security program. Not-for-profits and the other industries we work with each carry obligations of their own, and an organisation in regional Victoria answers the same schedule as one in the city.

Still unsure? Ring us.

1300 14 10 10

Monday to Friday, 8:30am to 5:30pm Melbourne time. Calling is always the fastest way to get help.