# Cloud migration in Melbourne, one system at a time.

> Planned cloud migrations for Melbourne organisations, including Azure, with data residency settled before anything moves. See the five stages.

Canonical: https://techosity.au/cloud-migration-melbourne/
Last updated: 2026-09-30

Cloud migration moves your organisation's systems off its own hardware onto Azure or Microsoft 365, and our Melbourne team keeps the old system standing until the new one proves itself.

[Book an assessment](https://techosity.au/contact/) [Call 1300 14 10 10](tel:1300141010)

![Illustration: two colleagues packing up a shelf of ring binders while working at a laptop](https://techosity.au/images/illustration/svc-cloud-migration-melbourne.avif)

## What are cloud migration services?

Cloud migration services are planned moves from hardware you own onto a cloud platform, such as Microsoft Azure or [Microsoft 365](https://techosity.au/microsoft-365/), with the old equipment switched off at the end.

In practice it is a handful of moves: often the file server, the mailboxes and one application keeping an old machine alive. A system or two can often be retired instead of moved.

## Four things you can do with any system you run.

Which of these is the right call for the system you are thinking about?

The first job is an inventory of every system you run and what depends on it. It often turns up a system with no named owner that people still use every week. With the list written, each system takes one of four migration options, and for many of them the right answer moves nothing at all.

We work through these with you, system by system, before anything moves.

1. When: When it works and nothing is straining

   ### Leave it alone

   It is supported, and nothing about how the business runs is pushing against it. Migration plans call this retain.

   What it costs to get wrong nothing, provided somebody checked the support dates and the backups. The risk is calling a system fine without looking.
2. When: When the problem is underneath it

   ### Move it as it is

   Plans call this rehost or relocate, or lift and shift: the same system, running on Microsoft's hardware in place of yours, because the server under it is ageing or the office it sits in is going.

   What it costs to get wrong the old design and the old permissions come along too, and now they cost you monthly.
3. When: When a service already does this job

   ### Rebuild it on a cloud service

   What you want is something a service already does: file sharing and mail in Microsoft 365, or a database somebody else patches. Plans call this replatform, repurchase or refactor.

   What it costs to get wrong time and disruption, if it was never needed. This is the option that adds the most time to a migration.
4. When: When it has quietly stopped earning its place

   ### Retire it

   Two people use it, it duplicates something you pay for, or the reason it existed left the business years ago.

   What it costs to get wrong nothing, and it is the only option that lowers what you spend every month.

## What a cloud migration quote depends on.

Like the rest of our [AI automation](https://techosity.au/ai-automation/) work, there is no price list. A migration is quoted in writing after the inventory, once we know what is moving and what is being retired.

What changes the quote: how many systems move, how much data there is, applications with a database, whether access is settled first, and data residency. A system you retire costs nothing to move.

Keeping every copy in Australia can narrow which services fit. ISO 27001 asks that what a supplier does with your data is covered in the agreement, and techosity is an [ISO 27001 certified organisation](https://techosity.au/iso-27001/).

![Illustration: two colleagues sorting systems into what moves and what stays](https://techosity.au/images/cutout/cloud-decision.avif)

## Five stages, and the first two move no data at all.

The two stages before anything is copied are where a migration shrinks to the moves that matter.

1. Nothing moves yet

   ### Write down what you run

   Every system, where it lives, what depends on it and when its support ends.

   You hold **The inventory**
2. Nothing moves yet

   ### Decide, system by system

   Leave, move, rebuild or retire, with the reason beside each. It is [IT strategy](https://techosity.au/it-strategy-roadmap/) applied to one project.

   You hold **A decision for every system**
3. ### Move one group first

   One team or one shared folder, doing real client work on the new system. A trial on test data would not show how it copes with that work.

   You hold **A group running on real work**
4. Gate: **The cutover date** Set to avoid your busiest week

   ### Cut over, old system standing

   In a quiet weekend or week, with the way back agreed before anything switches.

   Cutover the moment the new system becomes the real one

   You hold **A rollback agreed in advance**
5. Gate: **A month end on the new system** Before anything old is switched off

   ### Switch the old one off

   Decommission the server, cancel its licence and get it out of the cupboard, on a set date.

   You hold **One system to pay for**

## Four things that go wrong, and none of them are exotic.

### The hidden connection to the old server

A quoting tool reads a file path on the old server, and it only shows on the Monday after the cutover.

**What we do:** map what talks to what first, including the mapped drives and scripts that never appear on a licence list.

### Suddenly everyone can see everything

Years of folder permissions are hard to copy faithfully. The quick way to finish on time is to open everything up and tidy later, and the tidying tends not to happen.

**The fix:** decide who should have access before the move, and treat the move as the chance to fix it.

### There was nothing to fall back to

The old system is switched off on the Friday, the new one misbehaves on the Monday, and going back was never planned for.

**What we do:** keep the old environment standing until the new one has survived a month end or your busiest week.

### A monthly bill bigger than the old server

A system moved across as it is brings its old sizing with it, and the cloud charges for that capacity every month.

**The fix:** retire what is not needed first, then pay for the capacity you use.

## Questions organisations ask about cloud migration

### How long does a cloud migration take?

It depends on how many systems move and what they are, so the plan gives you dates once the inventory is done. The two planning stages take the least time and save the most. What stretches it is an application with a database, a vendor who has to confirm support in writing, or a busy period to avoid.

### What are the seven types of cloud migration?

They are retain, retire, rehost, relocate, replatform, repurchase and refactor, often called the seven Rs. They come down to four decisions: retain leaves a system alone, rehost and relocate move it as it is, and replatform, repurchase and refactor rebuild it on a cloud service. Retire switches it off. Refactor, a rewrite for the cloud, costs the most.

### How much downtime should we expect?

For mail and files the switch is usually made in a quiet window, an evening or a weekend. The copying runs for days beforehand, so only the final switch happens then. An application with a database behind it is different, and the answer depends on how large that database is and whether it can run in two places at once. We give you a figure for your systems before you agree a date.

### We have an old line of business application. Can it even move?

Sometimes yes, sometimes no, and the deciding factor is what the vendor supports. Some of these applications run happily on a cloud server with no change at all. Some are only supported on a machine you own, sitting in your office. Ask the vendor in writing before anything is designed, because their answer changes the shape of the whole project, and if the answer is no, we plan around it.

### Is this going to cost us less?

Not always.

A system moved across as it is can cost more every month than the hardware it replaced, because the old sizing comes with it. Savings come from switching things off, from paying for the capacity you use, and from not buying the next server.

### Where will the data live, backup copy included?

Named as a region in writing before the first byte moves, with the backup copy checked to sit there too. If a system cannot keep its data in Australia, we tell you before the move. Client agreements, insurance questionnaires and some regulators ask directly, and the answer has to be true for the backup copy as well. How we weigh data risk is set out under [cyber risk management](https://techosity.au/cyber-risk-management/).

### What happens if it goes wrong on the Monday?

The old environment stays intact and reachable, and the plan names in advance what would send us back to it and who makes that call. Nothing is decommissioned on the day of a cutover. The old system stays available until the new one has been through a month end, or a settlement week, or whatever your busiest stretch is.

### Does Microsoft have its own migration tools?

Yes.

Microsoft provides tools for copying files and mailboxes into Microsoft 365 and for moving servers into Azure, and we use them. They copy data well. What should move, who has access afterwards and when the old system is switched off are decisions the plan makes with you.

### Who does the work, and will we be handed to somebody we have never met?

The plan names who does each stage, including one person from your side and one from ours at the cutover. Afterwards our service desk supports the result, on the same number as everything else. Its survey result is 98% satisfaction across 3,184 surveyed support interactions, as at 13 October 2026. techosity is an [ISO 27001 certified organisation](https://techosity.au/iso-27001/), and our team includes two [Certified Information Systems Security Professionals (CISSP)](https://techosity.au/about/#cissp), a [Certified Cloud Security Professional (CCSP)](https://techosity.au/about/#ccsp) and an [ISO 27001 Lead Auditor](https://techosity.au/about/#iso-27001-lead-auditor). Day to day support of the result is [Technology Support](https://techosity.au/technology-support/).

### Still unsure? Ring us.

[1300 14 10 10](tel:1300141010)

Monday to Friday, 8:30am to 5:30pm Melbourne time. Calling is always the fastest way to get help.

## Point us at the system you would least like to move.

A machine in a cupboard, an application everyone avoids, or a renewal date forcing the question: tell us about that one and we will say plainly whether it needs to move.

[Call 1300 14 10 10](tel:1300141010)

Monday to Friday, 8:30am to 5:30pm Melbourne time.

To [hello@techosity.au](mailto:hello@techosity.au)

Subject A question about Cloud Migration

### Bring this

- The machine in a cupboard
- The application everyone avoids touching
- The renewal date forcing the question

[Write this email](mailto:hello@techosity.au?subject=A%20question%20about%20Cloud%20Migration&body=Bring%20this%3A%0A-%20The%20machine%20in%20a%20cupboard%0A-%20The%20application%20everyone%20avoids%20touching%0A-%20The%20renewal%20date%20forcing%20the%20question%0A%0A) Opens your email with these lines filled in. We reply within one business day.
